Short answer: myFloridaATM.com, a brand-new ATM installation website for Central Florida, launched on October 3, 2026 and was showing on Google’s first page within about 3 days — the homepage averaged position 7.7 in its first full day of search data, with 5 clicks from 12 impressions. Every number below is a dated screenshot from WordPress or Google Search Console.
The Project at a Glance
| Detail | |
|---|---|
| Client | myFloridaATM.com (Hunza, LLC) — ATM installation, Winter Park, FL |
| Site type | New WordPress site, local service business |
| Launch date | October 3, 2026 |
| First Google data | October 5, 2026 |
| Result (first 24 hours of data) | 5 clicks · 12 impressions · 41.7% CTR · average position 10.2 |
| Homepage position | 7.7 (page 1) |
What We Did
- Built the site around one primary keyword, “ATM installation,” plus city and service variations
- Wrote direct-answer blocks, FAQ sections and FAQ schema on every key page (for Google and AI answers)
- Added LocalBusiness schema, a service-area setup and hyper-local content for 6 Central Florida cities
- Connected Google Search Console, submitted the sitemap and requested indexing for the main pages on day 2
- Connected Bing Webmaster Tools and IndexNow so new pages reach Bing, ChatGPT search and Copilot instantly
The Proof, Step by Step
1. Launch: October 3, 2026
The WordPress Pages list shows the homepage and core pages published on the evening of October 3.

2. Google receives the site: October 5, 2026
Google Search Console confirms the sitemap was submitted on October 5 and read successfully, with 26 pages discovered.

3. First search results within 24 hours of Google data
In the first 24-hour window of Search Console data, the site earned 5 clicks from 12 impressions — a 41.7% click-through rate — at an average position of 10.2.

4. Homepage on page 1
The homepage averaged position 7.7, which is on Google’s first page (positions 1–10).

5. #1 organic result in a live Google search
An Incognito search for “atm installation winter park FL”, located in Winter Park, shows the Winter Park service page as the #1 organic result, below Google’s AI Overview and local business listing. The system clock in the top-right corner shows the date and time.

Results Timeline
| Day | Date | Milestone |
|---|---|---|
| Day 0 | Oct 3 | Site launched |
| Day 2 | Oct 5 | Sitemap submitted; indexing requested |
| Day 2–3 | Oct 5–6 | First clicks and impressions; homepage at average position 7.7 |
| Day 4 | Oct 7 | #1 organic result for “atm installation winter park FL” (Incognito, Winter Park) |
Coming Next (Updating This Case Study)
[TO ADD on or after Oct 9: 3-month Performance chart and the Queries tab showing the exact keywords and positions. Then 30-day and 90-day updates.]
A Note on the Numbers
These are early results from the first days of Google data. Average position is an average across all searches the site appeared for, and early positions can move as Google learns about a new site. We’ll keep updating this page with longer-term results.
Want results like this for your business? Get in touch.
